page_banner

High quality galvanized steel coil roofing sheet hot rolled steel coil building material

High quality galvanized steel coil roofing sheet hot rolled steel coil building material

Short Description:

Hot rolled coil refers to the pressing of billets into the desired thickness of steel at high temperatures. In hot rolling, steel is rolled after being heated to a plastic state, and the surface may be oxidized and rough. Hot rolled coils usually have large dimensional tolerances and low strength and hardness, and are suitable for construction structures, mechanical components in manufacturing, pipes and containers.


  • Inspection: SGS, TUV, BV, Factory Inspection
  • Grade: Carbon steel
  • Material: 60, 65Mn, 55Si2Mn, 60Si2MnA, 50CrVA,
  • Technique: Hot Rolled
  • Width: 600-4050mm
  • Tolerance: ±3%, +/-2mm Width: +/-2mm
  • Advantage: Accurate Dimension
  • Delivery Time: 3-15 days (according to the actual tonnage)
  • Port Information: Tianjin Port, Shanghai Port, Qingdao Port, etc.
  • Product Detail

    Product Tags

    Product Detail

    Product Name

    Hotselling Best Quality A Large Amount Hot Rolled Steel Coil

    Material

    Q195/Q235/Q345A36/S235JR/S355JR

     Thickness

    1.5mm~24mm

    Size

    3x1219mm  3.5x1500mm  4x1600mm  4.5x2438mm customized

    Standard

    ASTM A53-2007, ASTM A671-2006, ASTM A252-1998, ASTM A450-1996, ASME B36.10M-2004, ASTM A523-1996, BS 1387, BS EN10296, BS
    6323, BS 6363, BS EN10219, GB/T 3091-2001, GB/T 13793-1992, GB/T9711

    Grade

    A53-A369, Q195-Q345, ST35-ST52
    Grade A, Grade B, Grade C

    Technique

    Hot rolled

    Packing

    Bundle, or with all kinds of colors PVC or as your requirements

    Pipe Ends

    Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc.

    MOQ

    1 Tons, more quantity price will be lower

    Surface Treatment

    1. Mill finished /Galvanized /stainless steel
    2. PVC,Black and color painting
    3. Transparent oil,anti-rust oil
    4. According to clients requirement

    Product Application

    • 1. Manufacturing of building structures,

     

    • 2. lifting machinery,

     

    • 3. engineering,

     

    • 4. agricultural and construction machinery,

     

    Origin

    Tianjin China

    Certificates

     ISO9001-2008,SGS.BV,TUV

    Delivery Time

    Usually within 10-15 days after receipt of advance payment
    热轧卷_01
    热轧卷_02
    热轧卷_03
    热轧卷_04

    Main Application

    application

    1.Fluid / Gas delivery, Steel structure, Construction;
    2.ROYAL GROUP ERW/Welded round carbon steel pipes, which with Highest quality and strong supply ability are widely used in Steel structure and Construction.

    Note:
    1.Free sampling, 100% after-sales quality assurance, Support any payment method;
    2.All other specifications of round carbon steel pipes are available according to your requirement (OEM&ODM)! Factory price you will get from ROYAL GROUP.

    Size Chart

    Thickness(mm) 3 3.5 4 4.5 5 5.5 customized
    Width(mm) 800 900 950 1000 1219 1000 customized

    Process of production

    molten iron magnesium-based desulfurization-top-bottom re-blowing converter-alloying-LF refining-calcium feeding line-soft blowing-medium-broadband conventional grid slab continuous casting-cast slab cutting One heating furnace, one rough rolling, 5 passes, rolling, heat preservation, and finishing rolling, 7 passes, controlled rolling, laminar flow cooling, coiling, and packaging.

    热轧卷_08
    0 (44)
    0 (40)

    Packing and Transportation

    Usually bare package 

    热轧卷_05
    热轧卷_06

    Transportation: Express (Sample Delivery), Air, Rail, Land, Sea shipping (FCL or LCL or Bulk)

    热轧卷_07

    Our Customer

     

    FAQ

    Q: Are u a manufacturer?

    A: Yes, we are spiral steel tube manufacturer locates in Daqiuzhuang village, Tianjin city, China

    Q: Can I have a trial order only several tons?

    A: Of course. We can ship the cargo for u with LCL serivece.(Less container load)

    Q: Do u have payment superiority?

    A: For big order, 30-90 days L/C can be acceptable.

    Q: If sample free?

    A: Sample free, but the buyer pays for the freight.

    Q: Are you gold supplier and do trade assurance?

    A: We seven years cold supplier and accept trade assurance.


  • Previous:
  • Next:

  • Write your message here and send it to us